Varnish 7.5 Running Outdated Binary — Restart Required After Update on Rocky Linux 9
Varnish 7.5 package was updated but the service was not restarted. Running old binary with known vulnerability. Needs-restarting flag set.
Pattern
PERFORMANCE_DEGRADATION
Severity
MEDIUM
Confidence
51%
Remediation
Auto-Heal
Test Results
Metric
Expected
Actual
Result
Pattern Recognition
PERFORMANCE_DEGRADATION
PERFORMANCE_DEGRADATION
Severity Assessment
MEDIUM
MEDIUM
Incident Correlation
N/A
None
Cascade Escalation
N/A
No
Remediation
—
Auto-Heal — Corax resolves autonomously
Scenario Conditions
Rocky Linux 9. Varnish 7.5 package updated via apt/yum. Process still running old binary (deleted). needs-restarting check: true. Known CVE in running version.
Injected Error Messages (1)
Varnish 7.5 degraded on Rocky Linux 9 — running deleted binary, package updated but not restarted, response time degraded, /proc/3545/exe points to deleted file, needs-restarting: true
Neural Engine Root Cause Analysis
Performance degradation detected — response times are significantly above baseline, indicating resource pressure, increased load, or infrastructure issues.
Remediation Plan
Investigate server resource usage (CPU, memory, disk I/O). Check for background jobs or traffic spikes. Optimize slow queries or endpoints if specific to one service.