Back to All Scenarios
PASSEDdatabase / gc_pressure

Neo4j 5.18 GC Pauses Causing Latency Spikes on CentOS 9 Stream

Neo4j 5.18 is experiencing excessive garbage collection pauses. Response times spiking during GC cycles. P99 latency 10x normal.

Pattern
PERFORMANCE_DEGRADATION
Severity
MEDIUM
Confidence
51%
Remediation
Auto-Heal

Test Results

MetricExpectedActualResult
Pattern RecognitionPERFORMANCE_DEGRADATIONPERFORMANCE_DEGRADATION
Severity AssessmentHIGHMEDIUM
Incident CorrelationN/ANone
Cascade EscalationN/ANo
RemediationAuto-Heal — Corax resolves autonomously

Scenario Conditions

CentOS 9 Stream. Neo4j 5.18 GC pause time 359ms. GC frequency: every 5 seconds. Heap at 90%. Response time degraded 49x.

Injected Error Messages (1)

Neo4j 5.18 degraded performance on CentOS 9 Stream — garbage collection pauses 359ms, response time spike 49x normal, high latency during GC cycles, P99 latency critical

Neural Engine Root Cause Analysis

Performance degradation detected — response times are significantly above baseline, indicating resource pressure, increased load, or infrastructure issues.

Remediation Plan

Investigate server resource usage (CPU, memory, disk I/O). Check for background jobs or traffic spikes. Optimize slow queries or endpoints if specific to one service.

Improvements Applied

  • Severity: MEDIUM (expected HIGH)
Tested: 2026-04-02Monitors: 1 | Incidents: 1Test ID: cmnhnvz48034qlijgg025viic